Specific findings
Three salespeople followed eight customers; four made clear progress. Two deliveries remain overdue, while one delayed quote was completed.
Lin: model agreed; help needed on a file
EmmaAgreed on P3.9; the delivery city is still pending.
SofiaPhotometric file overdue. Help coordinate engineering so Sofia can finish her lighting review.
LucasDimensions await installation drawings; no deadline was agreed.
Zhou: specs on time; delayed quote completed
OmarSpec sheet sent one hour early; model agreed. Freight and sample approval remain pending.
NoahQuote delivered two days late. Noah accepted freight and requested a PI. Both delay and recovery matter.
Xu: test passed; an older delivery remains open
AvaCustomer confirmed the dimming test passed and requested a quote for 200 lights.
MiaLast week’s wiring diagram is still unsent; coordinate a realistic delivery time.
LiamColor temperature awaits the customer; no deadline was agreed, so this is not overdue.
Evidence
Emma · Emma · 2026-05-25 10:00 (UTC+8)
We need a 6 × 3 m outdoor LED screen for our rental events on 18 June.
Emma · Lin · 2026-05-27 11:00 (UTC+8)
For weekly moves, I recommend P3.9 with quick-lock cabinets. Would that work for your setup?
Emma · Emma · 2026-05-28 10:00 (UTC+8)
P3.9 works for us. Please use that in the quote. The delivery city is not decided yet.
Sofia · Sofia · 2026-05-26 09:00 (UTC+8)
We need 120 of the 200W floodlights for a stadium. Our designer needs the photometric file to finish the lighting review.
Sofia · Lin · 2026-05-28 14:00 (UTC+8)
I’ll send the photometric file by Friday, 29 May, at 5 pm Shanghai time.
Sofia · Lin · 2026-05-29 17:20 (UTC+8)
I haven’t sent the file yet. I’m still waiting for it from engineering.
Sofia · Lin · 2026-05-31 20:00 (UTC+8)
The file is still not sent; I’m waiting on engineering.
Omar · Omar · 2026-05-27 15:00 (UTC+8)
We need 80 of the 150W high bays for our warehouse. The mounting height is 9 metres.
Omar · Zhou · 2026-05-28 16:00 (UTC+8)
At that height, HB150-B is the better fit. Shall I calculate freight for 80 units?
Omar · Omar · 2026-05-29 11:00 (UTC+8)
Yes, use HB150-B. Please confirm freight first. Do not send the sample yet.
Omar · Zhou · 2026-05-28 16:10 (UTC+8)
I’ll send the HB150-B spec sheet by 6 pm today, Shanghai time.
Omar · Zhou · 2026-05-28 17:00 (UTC+8)
Here is the HB150-B spec sheet we discussed.
Omar · Omar · 2026-05-29 10:50 (UTC+8)
Received the spec sheet, thank you. It gives our engineer the details needed to choose the model.
Lucas · Lucas · 2026-05-25 15:00 (UTC+8)
We need 20 window displays for the mall. The installation drawings are not ready yet.
Lucas · Lin · 2026-05-26 10:00 (UTC+8)
Please send the drawings when available so we can confirm dimensions. We have not agreed a delivery date yet.
Noah · Noah · 2026-05-22 10:00 (UTC+8)
We need 40 outdoor LED cabinets. Please revise the quote with sea freight.
Noah · Zhou · 2026-05-25 10:00 (UTC+8)
I will send the revised quote by Tuesday, 26 May, 5 pm Shanghai time.
Noah · Zhou · 2026-05-27 09:00 (UTC+8)
I missed yesterday’s deadline. The freight quote is still pending.
Noah · Zhou · 2026-05-28 17:00 (UTC+8)
Here is the revised quote including sea freight. Sorry it is two days late.
Noah · Noah · 2026-05-29 09:00 (UTC+8)
Received. The freight price is acceptable. Please prepare the PI.
Ava · Ava · 2026-05-25 09:00 (UTC+8)
We need dimmable panel lights for 200 offices. Can you send one sample for testing?
Ava · Xu · 2026-05-26 09:00 (UTC+8)
The requested sample has been dispatched for your dimming test.
Ava · Ava · 2026-05-29 14:00 (UTC+8)
Our dimming test passed. Please quote 200 units of this model.
Mia · Mia · 2026-05-20 09:00 (UTC+8)
We need the wiring diagram for 12 installed LED screens before planning installation work.
Mia · Xu · 2026-05-21 09:00 (UTC+8)
I will send the wiring diagram by Friday, 22 May, 5 pm Shanghai time.
Mia · Xu · 2026-05-25 09:00 (UTC+8)
I have not sent the wiring diagram. It missed Friday’s deadline.
Mia · Xu · 2026-05-31 16:00 (UTC+8)
The wiring diagram is still not ready. I am checking with engineering.
Liam · Liam · 2026-05-27 09:00 (UTC+8)
We need 60 track lights, but have not chosen warm or neutral white yet.
Liam · Xu · 2026-05-28 09:00 (UTC+8)
I can send comparison photos to help you choose. We have not agreed on a delivery date.